First step: Site Preparation (Site Prep abreviate) Check server room and overall environment ,Air condition,Power,Floor,Strength ZBefore/After Kickoff)
Next phase :Hardware Implementation
Site preparation | ||
Power cord | ||
Rack entrance | ||
Rack position | ||
Site prepare | ||
Hardware Implementation | ||
Hardware Delivery | ||
Hardware Installation and setup | ||
Install hardware into RACK | ||
Install Servers | ||
Install SAN switch 4/8 (2units) | ||
Install Storage | ||
Install tape library | ||
Wiring Cable | ||
Install Operating System | ||
Install UNIX and Windows OS | ||
Mirror OS disks(for Unix) | ||
Install Tool for Manage (SAN,Backup) | ||
Configure SAN switch | ||
Configure Storage | ||
Assign Disk to hosts | ||
UAT HW | ||
Test redundancy (Power cord,Mirror OS,SAN,Lan,Network etc | ||
Software Implementation | ||
[Category application] | ||
Documentation Arrangeing | ||
System manual | ||
Disaster recovery actions manual |