SAP PP Transaction Code

** Credit web http://www.sap-img.com/general/sap-r3-transaction-codes.htm
SAP Production Planning Modules TCode
MATERIAL
CREATE-GENERAL       MM01       IMMEDIETELY
                     MM11       SCHEDULE
CHANGE               MM02       IMMEDIETELY
                     MM12       SCHEDULE
                     MM13       ACTIVATE
FLAG FOR DELETION    MM06       IMMEDIETELY
                     MM16       SCHEDULE
DISPLAY              MM03       DISPLAY CURRENT
                     MM19       DISPLAY AT KEY DATE
DISPLAY CHANGES      MM04       ACTIVE CHANGES
                     MM14       SCHEDULE CHANGES
                     MM17       MASS MAINTENANCE
                     MMAM       CHANGE MATERIAL TYPE
OTHER                MMBE       STOCK OVERVIEW
                     MMPV       CLOSE PERIOD
                     MMRV       ALLOW POSTING TO
                                PREVIOUS PERIOD
                     MM50       INSTANT MATERIAL VIEW
                     MMSC       ENTER STORAGE LOCATIONS
                     MM60       MATERIAL LIST
ARCHIVING(MATERIAL)  MM71       ARCHIVE/DELETE
                     MM72       DISPLAY ARCHIVE
BILL OF MATERIAL (MATERIAL BOM)
                     CS01       CREATE
                     CS02       CHANGE
                     CS03       DISPLAY
EXTRAS               CS28       ARCHIVING
                     CS20       MASS CHANGES
EVALUATION/BOM       CS11       BOM MULTILEVEL
EXPLOSION/MATERIAL   CS12       STRUCTURE MULTILEVEL
BOM                  CS13       SUMMURISED BOM
WORK CENTRES
                     CR01       CREATE
                     CR02       CHANGE
                     CR03       DISPLAY
                     CA85       REPLACE
CAPACITY             CR11       CREATE
                     CR12       CHANGE

                    CR13       DISPLAY
HIERARCHY            CR21       CREATE
                     CR22       CHANGE
                     CR23       DISPLAY
LINE HIERARCHY       LDB1       CREATE
                     LDB2       CHANGE
                     LDB3       DISPLAY
REPORTING            CR60       W/C INFORMATION SYSTEM
                     CR05       W/C LIST
                     CR06       COST CENTRE ASSIGNMENT
                     CR07       W/C CAPACITIES
                     CR08       W/C HIERARCHY
WHERE USED           CA80       WORK CENTRE
                     CR15       CAPACITY
                     CR10       CHANGE DOCUMENTS
EXTRAS               CR09       STD. TEXTS TASK LIST
                     CR41       ARCHIVING
ROUTING
STAD. ROUTING        CA01       CREATE
                     CA02       CHANGE
                     CA03       DISPLAY
REF. OPERATION SETS  CA11       CREATE
                     CA12       CHANGE
                     CA13       DISPLAY
RATE ROUTING         CA21       CREATE
                     CA22       CHANGE
                     CA23       DISPLAY
REF. RATE ROUTING    CA31       CREATE
                     CA32       CHANGE
                     CA33       DISPLAY
EXTRAS               CA85       REPLACE W/C
MASS CHANGES         CA95       REPLACE REF. OP. SET
                     CA75       REPLACE PRT
DELETE TASK LIST     CA99       WITH ARCHIVING
                     CA98       W/O ARCHIVING
REPORTING            CA80       WORK CENTRE
WHERE USED LIST      CA90       REF. OP. SETS
                     CA70       PRODUCTION RESORCE TOOLS
COST CENTRE
                     OKKP       MAINTAIN CONTROLLING AREA
                     KS01       CREATE COST CENTRE
                     KZS2       CREATE COSTING SHEET
                     KA01       CREATE PRI. COST ELEMENT
                     KA06       CREATE SEC. COST ELEMENT
                     KL01       CREATE ACTIVITY TYPE
                     KP26       ACTIVITY TYPE/PRICE PLANNING
What is the T-Code for trigger point?
CO30     MENUCO30      Standard trigger points 
CO31     SAPMCNSM     Create standard trigger point 
CO32     SAPMCNSM     Change standard trigger point 
CO33     SAPMCNSM     Display standard trigger point 
What the tcodes to archieve/delete a material BOM? - by Jia
Look at this option to delete a material BOM
There are two ways of deleting BOMs: 
- Using the Delete function. 
- Using the Deletion indicator. 
If you select the deletion indicator, the BOM is archived in the next reorganization run, and can be deleted if required. In the BOM header, you set the indicator that controls physical deletion after the archiving run. You can still process the BOM within its validity period.This also applies if the deletion indicator is entered with reference to a change number with a valid-from date that is after the date of the next reorganization run 
You can use the below mentioned tcodes:
CS25/CS28        Archiving for BOMs
CS26                  BOM deletion
CS27                  Retrieval of BOMs
SALES AND OPERATIONS PLANNING
PRODUCT GROUP        MC84       CREATE
                     MC86       CHANGE
                     MC85       DISPLAY
GRAPHIC              MC91       PRODUCT GROUP
                     MC92       OVERVIEW
PLANNING             MC81       CREATE
FOR PRODUCT GROUP    MC82       CHANGE
                     MC83       DISPLAY
                     MC75       TRANSFER PG TO PLANNING
FOR MATERIAL         MC87       CREATE
                     MC88       CHANGE
                     MC89       DISPLAY
                     MC74       TRANSFER MATERIALS TO DM
                     MC9K       MATERIAL AVAILABILITY
VERSION MANAGEMENT   MC78       COPY
                     MC80       DELETE
FLEXIBLE PLANNING    MC93       CREATE
PLANNING             MC94       CHANGE
                     MC95       DISPLAY
                     MC9K       MATERIAL AVAILABILITY
TOOLS/PLANNING TYPE  MC8A       CREATE
MACRO                MC8B       CHANGE
                     MC8C       DISPLAY
EVENT                MC64       CREATE
                     MC65       CHANGE
                     MC66       DISPLAY
ROUGH CUT PLANNING   MC35       CREATE
PROFILE              MC36       CHANGE
                     MC37       DISPLAY
ENVIRONMENT          MC90       TRANSFER MATERIALS TO DM
ACTIVITY REQT.       KSPP       TRANSFER TO COST CENTRE
                     KSBL       COST CENTRE OLANNING REPORT
                     KSOP       TRANSFER TO ACTIVITY BASED COSTING
                     CPBL       PLANNING REPORT PROCESSES
                     MC9C       REPORTING
SETTINGS             MC96       FORECAST PROFILE
DISSAGGRIGATION      MC76       BREAKDOWN PG PLAN
                     MC77       DISPLAY PG PLAN
                     MC75       TRANSFER PG TO PLANNING
                     MC74       TRANSFER MATERIALS TO DM
FORECASTING
INDIVIDUAL FORECAST  MP30       EXECUTE
                     MP31       CHANGE
                     MP32       DISPLAY
TOTAL FORECAST       MP38       EXECUTE
                     MP33       REPROCESS
                     MP39       PRINT
                     MPBT       EXECUTE BACKGROUND
                     MPDR       PRINT BACKGROUND
DEMAND MANAGEMENT
PIR                  MD61       CREATE
                     MD62       CHANGE
                     MD63       DISPLAY
                     MD65       REQTS. FOR SCINARIO
                     MD66       COPY SIMULATED DEPENDENT REQT.
                     MD70       COPY TOTAL FORE CAST
EVALUATION           MD73       DISPLAY TOTAL REQT.
                     MD79       EXCELL INTERFACE
                     MD4C       ORDER REPORT
                     MD72       CHARECTERISTICS PLANNING
CUSTOMER REQT.       MD81       CREATE
                     MD82       CHANGE
                     MD83       DISPLAY
REPETITIVE MANUFACTURING
MASTER DATA          C223       PRODUCTION VERTION
PRODUCT COST PLANNING
COSTING RUN          CKMATSEL   CREATE
SELECTION LIST       CKMATCON   Edit
                     CK40N      EDIT COSTING RUN
Material Requirement Planning
Menu Nodes           TransactionActivity
Master Data          MD25       Create planning calendar
                     MD26       Change planning calendar
                     MD27       Display planning calendar
                     MDSA       Display BOM explosion number
                     MDSP       Edit BOM explosion number
                     MEQ1       Maintain quota file
                     OPPP       Explode BOM by date
                     MDUS       Display project assignment
                     MDUP       Process project assignment
                     MDL1       Create production lot
                     MDL2       Change production lot
                     MDL3       Display production lot
Planning             MD20       Create planning file entry
                     MD21       Display planning file entry
                     MDAB       Set up planning file entry in background
                     MDRE       Check planning file entry
                     MD01       Total planning online
                     MDBT       Total planning in background
                     MD03       Single-item, single-level planning
                     MD02       Single-item, multi-level planning
                     MD43       Interactive single-item planning
                     MD50       Multi-level, make-to-order planning
                     MD51       Multi-level project planning
                     MF52       Display planning table
                     MF50       Change planning table
                     MF57       Planning table by MRP lists
                     MF51       Planning table by production list
Evaluations          MD04       Stock/requirements list
                     MD07       Collective access of stock/requirements lis
                     MD05       MRP list
                     MD06       Collective access of MRP lists
                     MDLD       Print MRP list
                     MD45       Planning result
                     MD46       Collective access of planning result
                     MD44       Planning situation for a material
                     MD47       Planning situation for a product group
                     MD48       Cross-plant planning situation
                     MD4C       Order report
                     MD09       Pegged requirements
                     CO46       Order progress
Planned Order        MD11       Create planned order
                     MD12       Change planned order
                     MD13       Individual access of planned order
                     MD16       Collective access of planned orders
                     MD14       Individual conversion of planned order into
                     MD15       Collective conversion of planned orders int
                     MDUM       Convert planned order into purchase requisi
                     CO40       Convert individual planned order into produ
                     CO41       Collective conversion of planned orders int
                     CO48       Partial conversion of planned order into pr
                     COR7       Individual conversion of planned order into
                     COR7_PC    Collective conversion of planned orders int
                     COR8       Partial conversion of planned order into pr
                     MDVP       Collective availability check
                     MDAC       Execute action for planned order
LONG TERM PLANNING
PALNNING SCENARIO    MS31       CREATE
                     MS32       CHANGE
                     MS33       DISPLAY
PLANNING RUN         MS01       ON LINE
                     MSBT       SA BACKGROUND JOB
                     MS02       SINGLE ITEM - MULTI LEVEL
                     MS03       SINGLE ITEM - SINGLE LEVEL
                     MS50       SINGLE ITEM - SALES ORDER
                     MS51       SINGLE ITEM PLANNING, PROJECT
                     MFSO       PLANNING TABLE
EVALUTIONS           MS05       MRP LIST MATERIAL
                     MS06       MRP LIST COLLECTIVE DISPLAY
                     MSLD       PRINT MRP LIST
                     MS04       STOCK/REQUIREMENTS LIST
                     MS07       STOCK/REQUIREMENT LIST COLLECTIVE DISPLAY
                     MS44       PLANNING SITUATION MATERIAL
                     MS47       SITUATION PRODUCT GROUP
MPS-MASTER SCHEDULE ITEMS
TOTAL PLANNING       MD40       ON LINE
                     MDBS       SA BACKGROUND JOB
                     MD41       SINGLE ITEM - MULTI LEVEL
                     MD42       SINGLE ITEM - SINGLE LEVEL
                     MD43       SINGLE ITEM - INTERACTIVE
                     MD50       SINGLE ITEM - SALES ORDER
                     MD51       SINGLE ITEM PLANNING, PROJECT
*** EVALUTION IS SIMILAR TO MRP
PRODUCTION CONTROL
ORDER - CREATE       CO01       WITH MATERIAL
                     CO07       WITHOUT MATERIAL
                     CO40       FROM PLANNED ORDER
                     CO41       COLLECTIVE CONVERTION OF PLANNED ORDER
                     CO08       FOR SALES ORDER
                     CO10       FOR PROJECT
                     CO02       CHANGE
                     CO03       DISPLAY
CONTROL              MD04       STOCK/REQUIREMENTS LIST
                     COHV       MASS PROCESSING
                     COMAC      COLLECTIVE AVAILABILITY CHECK
                     CO05N      COLLECTIVE RELEASE
                     CO04N      PRINT
                     CO09       AVAILABILITY OVER VIEW
GOODS MOVEMENT       MF65       STOCK TRANSFER FOR RESERVATION
MATERIAL STAGING     MF68       LOG
                     MB1A       GOODS ISSUE
                     MB31       GOODS RECEIPT
                     COWBPACK   PACK MATERIAL
CONFIRMATION         CO1V       TIME TICKET
FOR OPERATION        CO14       DISPLAY
                     CO13       CANCEL
                     CO1L       REQUESTED CONFIRMATIONS
                     CO1P       PREDEFINED PROCESSES
TOOLS-ARCHIVING      CO78       ORDER
                     KOAA       SETTELMENT DOCUMENTS
CAPACITY PLANNING
EVALUTION            CM01       LOAD
WORK CENTER VIEW     CM02       ORDERS
                     CM03       POOL
                     CM04       BACKLOG
                     CM05       OVERLOAD
                     CM07       VARIABLE
EXTENDED EVALUTION   CM50       WORK CENTER VIEW
                     CM51       INDIVIDUAL CAPACITY VIEW
                     CM52       ORDER VIEW
LEVELLING            CM21       PLANNING TABLE (GRAPHICAL)
WORK CENTER VIEW     CM22       PLANNING TABLE (TABULAR)
INDIVIDUAL CAPACITY VCM27       PLANNING TABLE (GRAPHICAL)
                     CM28       PLANNING TABLE (TABULAR)
ORDER VIEW           CM31       PLANNING TABLE (GRAPHICAL)
                     CM32       PLANNING TABLE (TABULAR)
AVAILABLE CAPACITY   CR12       CHANGE
CAPACITY             CR13       DISPLAY
                     OP4A       SHIFT SEQUENCE
                     OP43       FACTORY CALENDER
Where shall we maintain number range for planned orders?
To maintain number range for planned order. Go to:
MM-->CBP-->NUMBER RANGE-->DEFINE NUMBER RANGE FOR PLANNING RUN.
Don't allow External Number Assignment.
What is t.code for planning calendar and factory calendar?
Planning Calendar--MD25
Factory Calender--SCAL
Menu  Path 
SPRO-->Materials Management-->Master Data-->Maintain Planning 
SPRO-->Calendar--md25
SPRO-->General Settings-->Currencies-->Expiring Currencies-->Maintain 
SPRO-->Calendar-->SCAL
Tcodes of Common SAP PP Process
Step 1: Material Master 
Logistics > Production > Master Data > Material Master > Material > Create General > Immediately MM01 
Step 2: BOM creation 
Logistics > Production > Master Data > Bills of Material > Bills of Material > Material BOM > Create CS01 
Step 3: Work Center creation 
Logistics > Production > Master Data > Work Center > ( New Screen ) Work Center > Create CR01 
Step 4: Route creation 
Logistics > Production > Master Data > Routings > Routings > Routing > Create CA01 
Step 5: PIR Generation 
Logistics> Production>production planning>demand management>PIR>Create MD61 
Step 6: MRP Run 
Logistics>Materials Management>Material planning>MRP>MRP>Total Planning>Online MD01  
or 
Logistics > Production > MRP > MRP > Sng-Item, Multi-Level MD02 
Step 7: Evaluation through MRP list and Stock requirement list 
Logistics>Materials Management>Materials Planning>MRP>Evaluations>MRP List>Individual Display MD05 
Logistics>Materials Management>Materials Planning>MRP>Evaluations>Stock Requirements List MD04 
Step 8: Conversion of Planned order to Production order 
Logistics > Production > Production control > Order > Create > With a planned order CO40 
or 
Logistics >Production > Production control >Order > Create >With material CO01(For creating production order Without planned order) 
Step 9: Order management 
Logistics >Production > Production control >Order > Change >With material CO02 
Step10: Confirmations 
Logistics >Production >Production control >Confirmation >Enter >For order CO15 
or 
Logistics >Production >Production control >Confirmation >Enter >For Operation >For time ticket CO11N 
Step11: Goods issue 
1. Logistics >Production >Production Control >Environment >Goods Movement >Goods Issue 
2. Logistics >Materials Management >Inventory Management >Goods Movement >Goods Issue MB1A--261Movement type 
Step12: Goods receipt 
Logistics > Production > Production Order > Environment > Material Movement > Post Mat to Stock 
or 
Logistics > Materials Management > Inventory Management > Goods Movement > Good Receipt > For Order MB31 
Step13: Techo Or Close Order. 
This can be done from Prd. Order Header menu.

0 comments:

Loading