** Credit web http://www.sap-img.com/general/sap-r3-transaction-codes.htm
SAP Production Planning Modules TCode
MATERIAL
CREATE-GENERAL MM01 IMMEDIETELY
MM11 SCHEDULE
CHANGE MM02 IMMEDIETELY
MM12 SCHEDULE
MM13 ACTIVATE
FLAG FOR DELETION MM06 IMMEDIETELY
MM16 SCHEDULE
DISPLAY MM03 DISPLAY CURRENT
MM19 DISPLAY AT KEY DATE
DISPLAY CHANGES MM04 ACTIVE CHANGES
MM14 SCHEDULE CHANGES
MM17 MASS MAINTENANCE
MMAM CHANGE MATERIAL TYPE
OTHER MMBE STOCK OVERVIEW
MMPV CLOSE PERIOD
MMRV ALLOW POSTING TO
PREVIOUS PERIOD
MM50 INSTANT MATERIAL VIEW
MMSC ENTER STORAGE LOCATIONS
MM60 MATERIAL LIST
ARCHIVING(MATERIAL) MM71 ARCHIVE/DELETE
MM72 DISPLAY ARCHIVE
BILL OF MATERIAL (MATERIAL BOM)
CS01 CREATE
CS02 CHANGE
CS03 DISPLAY
EXTRAS CS28 ARCHIVING
CS20 MASS CHANGES
EVALUATION/BOM CS11 BOM MULTILEVEL
EXPLOSION/MATERIAL CS12 STRUCTURE MULTILEVEL
BOM CS13 SUMMURISED BOM
WORK CENTRES
CR01 CREATE
CR02 CHANGE
CR03 DISPLAY
CA85 REPLACE
CAPACITY CR11 CREATE
CR12 CHANGE
CR13 DISPLAY
HIERARCHY CR21 CREATE
CR22 CHANGE
CR23 DISPLAY
LINE HIERARCHY LDB1 CREATE
LDB2 CHANGE
LDB3 DISPLAY
REPORTING CR60 W/C INFORMATION SYSTEM
CR05 W/C LIST
CR06 COST CENTRE ASSIGNMENT
CR07 W/C CAPACITIES
CR08 W/C HIERARCHY
WHERE USED CA80 WORK CENTRE
CR15 CAPACITY
CR10 CHANGE DOCUMENTS
EXTRAS CR09 STD. TEXTS TASK LIST
CR41 ARCHIVING
ROUTING
STAD. ROUTING CA01 CREATE
CA02 CHANGE
CA03 DISPLAY
REF. OPERATION SETS CA11 CREATE
CA12 CHANGE
CA13 DISPLAY
RATE ROUTING CA21 CREATE
CA22 CHANGE
CA23 DISPLAY
REF. RATE ROUTING CA31 CREATE
CA32 CHANGE
CA33 DISPLAY
EXTRAS CA85 REPLACE W/C
MASS CHANGES CA95 REPLACE REF. OP. SET
CA75 REPLACE PRT
DELETE TASK LIST CA99 WITH ARCHIVING
CA98 W/O ARCHIVING
REPORTING CA80 WORK CENTRE
WHERE USED LIST CA90 REF. OP. SETS
CA70 PRODUCTION RESORCE TOOLS
COST CENTRE
OKKP MAINTAIN CONTROLLING AREA
KS01 CREATE COST CENTRE
KZS2 CREATE COSTING SHEET
KA01 CREATE PRI. COST ELEMENT
KA06 CREATE SEC. COST ELEMENT
KL01 CREATE ACTIVITY TYPE
KP26 ACTIVITY TYPE/PRICE PLANNING
What is the T-Code for trigger point?
CO30 MENUCO30 Standard trigger points
CO31 SAPMCNSM Create standard trigger point
CO32 SAPMCNSM Change standard trigger point
CO33 SAPMCNSM Display standard trigger point
What the tcodes to archieve/delete a material BOM? - by Jia
Look at this option to delete a material BOM
There are two ways of deleting BOMs:
- Using the Delete function.
- Using the Deletion indicator.
If you select the deletion indicator, the BOM is archived in the next reorganization run, and can be deleted if required. In the BOM header, you set the indicator that controls physical deletion after the archiving run. You can still process the BOM within its validity period.This also applies if the deletion indicator is entered with reference to a change number with a valid-from date that is after the date of the next reorganization run
You can use the below mentioned tcodes:
CS25/CS28 Archiving for BOMs
CS26 BOM deletion
CS27 Retrieval of BOMs
SALES AND OPERATIONS PLANNING
PRODUCT GROUP MC84 CREATE
MC86 CHANGE
MC85 DISPLAY
GRAPHIC MC91 PRODUCT GROUP
MC92 OVERVIEW
PLANNING MC81 CREATE
FOR PRODUCT GROUP MC82 CHANGE
MC83 DISPLAY
MC75 TRANSFER PG TO PLANNING
FOR MATERIAL MC87 CREATE
MC88 CHANGE
MC89 DISPLAY
MC74 TRANSFER MATERIALS TO DM
MC9K MATERIAL AVAILABILITY
VERSION MANAGEMENT MC78 COPY
MC80 DELETE
FLEXIBLE PLANNING MC93 CREATE
PLANNING MC94 CHANGE
MC95 DISPLAY
MC9K MATERIAL AVAILABILITY
TOOLS/PLANNING TYPE MC8A CREATE
MACRO MC8B CHANGE
MC8C DISPLAY
EVENT MC64 CREATE
MC65 CHANGE
MC66 DISPLAY
ROUGH CUT PLANNING MC35 CREATE
PROFILE MC36 CHANGE
MC37 DISPLAY
ENVIRONMENT MC90 TRANSFER MATERIALS TO DM
ACTIVITY REQT. KSPP TRANSFER TO COST CENTRE
KSBL COST CENTRE OLANNING REPORT
KSOP TRANSFER TO ACTIVITY BASED COSTING
CPBL PLANNING REPORT PROCESSES
MC9C REPORTING
SETTINGS MC96 FORECAST PROFILE
DISSAGGRIGATION MC76 BREAKDOWN PG PLAN
MC77 DISPLAY PG PLAN
MC75 TRANSFER PG TO PLANNING
MC74 TRANSFER MATERIALS TO DM
FORECASTING
INDIVIDUAL FORECAST MP30 EXECUTE
MP31 CHANGE
MP32 DISPLAY
TOTAL FORECAST MP38 EXECUTE
MP33 REPROCESS
MP39 PRINT
MPBT EXECUTE BACKGROUND
MPDR PRINT BACKGROUND
DEMAND MANAGEMENT
PIR MD61 CREATE
MD62 CHANGE
MD63 DISPLAY
MD65 REQTS. FOR SCINARIO
MD66 COPY SIMULATED DEPENDENT REQT.
MD70 COPY TOTAL FORE CAST
EVALUATION MD73 DISPLAY TOTAL REQT.
MD79 EXCELL INTERFACE
MD4C ORDER REPORT
MD72 CHARECTERISTICS PLANNING
CUSTOMER REQT. MD81 CREATE
MD82 CHANGE
MD83 DISPLAY
REPETITIVE MANUFACTURING
MASTER DATA C223 PRODUCTION VERTION
PRODUCT COST PLANNING
COSTING RUN CKMATSEL CREATE
SELECTION LIST CKMATCON Edit
CK40N EDIT COSTING RUN
Material Requirement Planning
Menu Nodes TransactionActivity
Master Data MD25 Create planning calendar
MD26 Change planning calendar
MD27 Display planning calendar
MDSA Display BOM explosion number
MDSP Edit BOM explosion number
MEQ1 Maintain quota file
OPPP Explode BOM by date
MDUS Display project assignment
MDUP Process project assignment
MDL1 Create production lot
MDL2 Change production lot
MDL3 Display production lot
Planning MD20 Create planning file entry
MD21 Display planning file entry
MDAB Set up planning file entry in background
MDRE Check planning file entry
MD01 Total planning online
MDBT Total planning in background
MD03 Single-item, single-level planning
MD02 Single-item, multi-level planning
MD43 Interactive single-item planning
MD50 Multi-level, make-to-order planning
MD51 Multi-level project planning
MF52 Display planning table
MF50 Change planning table
MF57 Planning table by MRP lists
MF51 Planning table by production list
Evaluations MD04 Stock/requirements list
MD07 Collective access of stock/requirements lis
MD05 MRP list
MD06 Collective access of MRP lists
MDLD Print MRP list
MD45 Planning result
MD46 Collective access of planning result
MD44 Planning situation for a material
MD47 Planning situation for a product group
MD48 Cross-plant planning situation
MD4C Order report
MD09 Pegged requirements
CO46 Order progress
Planned Order MD11 Create planned order
MD12 Change planned order
MD13 Individual access of planned order
MD16 Collective access of planned orders
MD14 Individual conversion of planned order into
MD15 Collective conversion of planned orders int
MDUM Convert planned order into purchase requisi
CO40 Convert individual planned order into produ
CO41 Collective conversion of planned orders int
CO48 Partial conversion of planned order into pr
COR7 Individual conversion of planned order into
COR7_PC Collective conversion of planned orders int
COR8 Partial conversion of planned order into pr
MDVP Collective availability check
MDAC Execute action for planned order
LONG TERM PLANNING
PALNNING SCENARIO MS31 CREATE
MS32 CHANGE
MS33 DISPLAY
PLANNING RUN MS01 ON LINE
MSBT SA BACKGROUND JOB
MS02 SINGLE ITEM - MULTI LEVEL
MS03 SINGLE ITEM - SINGLE LEVEL
MS50 SINGLE ITEM - SALES ORDER
MS51 SINGLE ITEM PLANNING, PROJECT
MFSO PLANNING TABLE
EVALUTIONS MS05 MRP LIST MATERIAL
MS06 MRP LIST COLLECTIVE DISPLAY
MSLD PRINT MRP LIST
MS04 STOCK/REQUIREMENTS LIST
MS07 STOCK/REQUIREMENT LIST COLLECTIVE DISPLAY
MS44 PLANNING SITUATION MATERIAL
MS47 SITUATION PRODUCT GROUP
MPS-MASTER SCHEDULE ITEMS
TOTAL PLANNING MD40 ON LINE
MDBS SA BACKGROUND JOB
MD41 SINGLE ITEM - MULTI LEVEL
MD42 SINGLE ITEM - SINGLE LEVEL
MD43 SINGLE ITEM - INTERACTIVE
MD50 SINGLE ITEM - SALES ORDER
MD51 SINGLE ITEM PLANNING, PROJECT
*** EVALUTION IS SIMILAR TO MRP
PRODUCTION CONTROL
ORDER - CREATE CO01 WITH MATERIAL
CO07 WITHOUT MATERIAL
CO40 FROM PLANNED ORDER
CO41 COLLECTIVE CONVERTION OF PLANNED ORDER
CO08 FOR SALES ORDER
CO10 FOR PROJECT
CO02 CHANGE
CO03 DISPLAY
CONTROL MD04 STOCK/REQUIREMENTS LIST
COHV MASS PROCESSING
COMAC COLLECTIVE AVAILABILITY CHECK
CO05N COLLECTIVE RELEASE
CO04N PRINT
CO09 AVAILABILITY OVER VIEW
GOODS MOVEMENT MF65 STOCK TRANSFER FOR RESERVATION
MATERIAL STAGING MF68 LOG
MB1A GOODS ISSUE
MB31 GOODS RECEIPT
COWBPACK PACK MATERIAL
CONFIRMATION CO1V TIME TICKET
FOR OPERATION CO14 DISPLAY
CO13 CANCEL
CO1L REQUESTED CONFIRMATIONS
CO1P PREDEFINED PROCESSES
TOOLS-ARCHIVING CO78 ORDER
KOAA SETTELMENT DOCUMENTS
CAPACITY PLANNING
EVALUTION CM01 LOAD
WORK CENTER VIEW CM02 ORDERS
CM03 POOL
CM04 BACKLOG
CM05 OVERLOAD
CM07 VARIABLE
EXTENDED EVALUTION CM50 WORK CENTER VIEW
CM51 INDIVIDUAL CAPACITY VIEW
CM52 ORDER VIEW
LEVELLING CM21 PLANNING TABLE (GRAPHICAL)
WORK CENTER VIEW CM22 PLANNING TABLE (TABULAR)
INDIVIDUAL CAPACITY VCM27 PLANNING TABLE (GRAPHICAL)
CM28 PLANNING TABLE (TABULAR)
ORDER VIEW CM31 PLANNING TABLE (GRAPHICAL)
CM32 PLANNING TABLE (TABULAR)
AVAILABLE CAPACITY CR12 CHANGE
CAPACITY CR13 DISPLAY
OP4A SHIFT SEQUENCE
OP43 FACTORY CALENDER
Where shall we maintain number range for planned orders?
To maintain number range for planned order. Go to:
MM-->CBP-->NUMBER RANGE-->DEFINE NUMBER RANGE FOR PLANNING RUN.
Don't allow External Number Assignment.
What is t.code for planning calendar and factory calendar?
Planning Calendar--MD25
Factory Calender--SCAL
Menu Path
SPRO-->Materials Management-->Master Data-->Maintain Planning
SPRO-->Calendar--md25
SPRO-->General Settings-->Currencies-->Expiring Currencies-->Maintain
SPRO-->Calendar-->SCAL
Tcodes of Common SAP PP Process
Step 1: Material Master
Logistics > Production > Master Data > Material Master > Material > Create General > Immediately MM01
Step 2: BOM creation
Logistics > Production > Master Data > Bills of Material > Bills of Material > Material BOM > Create CS01
Step 3: Work Center creation
Logistics > Production > Master Data > Work Center > ( New Screen ) Work Center > Create CR01
Step 4: Route creation
Logistics > Production > Master Data > Routings > Routings > Routing > Create CA01
Step 5: PIR Generation
Logistics> Production>production planning>demand management>PIR>Create MD61
Step 6: MRP Run
Logistics>Materials Management>Material planning>MRP>MRP>Total Planning>Online MD01
or
Logistics > Production > MRP > MRP > Sng-Item, Multi-Level MD02
Step 7: Evaluation through MRP list and Stock requirement list
Logistics>Materials Management>Materials Planning>MRP>Evaluations>MRP List>Individual Display MD05
Logistics>Materials Management>Materials Planning>MRP>Evaluations>Stock Requirements List MD04
Step 8: Conversion of Planned order to Production order
Logistics > Production > Production control > Order > Create > With a planned order CO40
or
Logistics >Production > Production control >Order > Create >With material CO01(For creating production order Without planned order)
Step 9: Order management
Logistics >Production > Production control >Order > Change >With material CO02
Step10: Confirmations
Logistics >Production >Production control >Confirmation >Enter >For order CO15
or
Logistics >Production >Production control >Confirmation >Enter >For Operation >For time ticket CO11N
Step11: Goods issue
1. Logistics >Production >Production Control >Environment >Goods Movement >Goods Issue
2. Logistics >Materials Management >Inventory Management >Goods Movement >Goods Issue MB1A--261Movement type
Step12: Goods receipt
Logistics > Production > Production Order > Environment > Material Movement > Post Mat to Stock
or
Logistics > Materials Management > Inventory Management > Goods Movement > Good Receipt > For Order MB31
Step13: Techo Or Close Order.
This can be done from Prd. Order Header menu.
0 comments:
Post a Comment